Two views
Board — cards in columns; dragging changes the status. List — a table with sorting and filtering by column. Pick whichever suits you; the data is the same.
Filters
- By status (multi-select)
- By assignee
- Grouping: ungrouped or by section
- Hide completed
Health indicator
A project can carry a state badge: on track, at risk, off track, on hold, complete, with a short note beside it. In the portfolio view a manager sees at a glance which project needs attention.